[1] P. Vilaça Gomes and J. Tomé Saraiva, “State-of-the-art of transmission expansion planning: A survey from restructuring to renewable and distributed electricity markets,” 2019, doi: 10.1016/j.ijepes.2019.04.035.
[2] Garver, L.L., 1970. “Transmission network estimation using linear programming. IEEE Trans. Power Appar. Syst., vol. PAS-89 (7), 1688–1697. https://doi.org/10.1109/TPAS.1970.292825
[4] Daniel, R., Wilian, G., 2022. Desarrollo de casos de estudios en base al Sistema Nacional Interconectado de Ecuador para el análisis de sistemas eléctricos de potencia,”. Universidad Técnica de Cotopaxi.
[5] Rider, M.J., Garcia, A.V., Romero, R., 2007. Power system transmission network expansion planning using AC model. IET Gener. Transm. Distrib., vol. 1 (5), 731–742. https://doi.org/10.1049/iet-gtd:20060465
[6] Torres, S.P., Castro, C.A., 2014. Expansion planning for smart transmission grids using ac model and shunt compensation. IET Gener. Transm. Distrib., vol. 8 (5), 966–975. https://doi.org/10.1049/IET-GTD.2013.0231
[7] de Araujo, R.A., Torres, S.P., Filho, J.P., Castro, C.A., Van Hertem, D., 2023. Unified AC transmission expansion planning formulation incorporating VSC-MTDC, FACTS devices, and reactive power compensation (Mar.). Electr. Power Syst. Res., vol. 216, 109017. https://doi.org/10.1016/J.EPSR.2022.109017
[8] Cajas, P., Torres, S.P., Chillogalli, J.E., Chamorro, H.R., Sood, V.K., Romero, R.R., 2022. AC multi-stage transmission network expansion planning considering a multi-voltage approach. IEEE PES Innov. Smart Grid Technol. Conf. Eur., vol. 2022-Octob. https://doi.org/10.1109/ISGT-EUROPE54678.2022.9960363
[9] Wang, Y., et al., 2021a. Flexible transmission network expansion planning based on dqn algorithm. Energies, vol. 14 (7), 1–21. https://doi.org/10.3390/en14071944
[10] Wang, Y., et al., 2021b. Transmission network dynamic planning based on a double deep-q network with deep ResNet. IEEE Access, vol. 9, 76921–76937. https://doi.org/10.1109/ACCESS.2021.3083266
[11] Wang, Y., et al., 2021c. Transmission network expansion planning considering wind power and load uncertainties based on multi-agent ddqn. Energies, vol. 14 (19), 1–28. https://doi.org/10.3390/en14196073
[12] Tejada, D., López-Lezama, J.M., Rider, M.J., Vinasco, G., 2015. Transmission network expansion planning considering repowering and reconfiguration. Int. J. Electr. Power Energy Syst., vol. 69, 213–221. https://doi.org/10.1016/j.ijepes.2015.01.008
[13] Bahiense, L., Oliveira, G.C., Pereira, M., Granville, S., 2001. A mixed integer disjunctive model for transmission network expansion (Aug.). IEEE Trans. Power Syst., vol. 16 (3), 560–565. https://doi.org/10.1109/59.932295
[14] Pupo-Roncallo, O., Campillo, J., Ingham, D., Ma, L., Pourkashanian, M., 2021. The role of energy storage and cross-border interconnections for increasing the flexibility of future power systems: the case of Colombia (May). Smart Energy, vol. 2, 100016. https://doi.org/10.1016/J.SEGY.2021.100016
[15] Villamarín, A., Haro, R., Aguirre, M., Ortíz, D., 2021. Evaluación de Resiliencia en el Sistema Eléctrico Ecuatoriano frente a Eventos Sísmicos [Evaluation of the Resilience of the Ecuadorian Electrical System to Seismic Events]. Rev. Técnica “Energ. ía, vol. 17 (2), 18–28. https://doi.org/10.37116/revistaenergia.v17.n2.2021.440
[16] Guamán, W.P., Pesántez, G.N., Torres R, M.A., Falcones, S., Urquizo, J., 2023. Optimal dynamic reactive power compensation in power systems: case study of Ecuador-Perú interconnection. Electr. Power Syst. Res., vol. 218 (February). https://doi.org/10.1016/j.epsr.2023.109191
[17] Benalcazar, P., Suski, A., Kamiński, J., 2020. Optimal sizing and scheduling of hybrid energy systems: the cases of Morona Santiago and the Galapagos Islands. Energies, vol. 13 (15). https://doi.org/10.3390/en13153933
[18] Ministerio de Energía y Minas, 2021. Balance Energetico Nacional Ecuador 2021. Ecuador National Energy Balance 2021].
[19] Benalcazar, P., Orozco, L.F., Kamiński, J., 2019. Resource dependence in ecuador: an extractives dependence index analysis. Gospod. Surowcami Miner. / Miner. Resour. Manag., vol. 35 (3), 49–62. https://doi.org/10.24425/gsm.2019.128533
[20] OLADE, 2022. Panorama Energético de América Latina y el Caribe 2022. First, Quito.
[21] MERNNR, “Plan Maestro de Electricidad 2018-2027,” Quito, 2018. [Online]. Available: 〈https://www.centrosur.gob.ec/wp-content/uploads/2020/01/Plan-Maestrode-Electricidad.pdf〉.
[22] Verdin, K.L., 2024. Hydrol. Deriv. Model. Anal. -A N. Glob. High. -Resolut. Database. https://doi.org/10.3133/ds1053
[23] Martínez, J., 2007. Coordinación de Aislamiento en Redes Eléctricas de Alta Tensión, 1a ed. McGraw-Hill, Madrid.
[24] Jacho, A., Barrera, H., Plazarte, J., Urquizo, J., 2021. Technical feasibility analysis of an underground HVDC line. A case study in Ecuador (Jun.). IEEE Int. Symp. Ind. Electron., vol. 2021-June. https://doi.org/10.1109/ISIE45552.2021.9576402
[25] MERNR, 2019. Plan Maest. De. Electr. Ecuad. 2018 - 2027.
[26] AEMO, 2021. Transm. Cost. Rep.
[27] Miranda, L., Mueller-Stoffels, M., Whitney, E., 2017. An Alaska case study: Electrical transmission. J. Renew. Sustain. Energy, vol. 9 (6). https://doi.org/10.1063/1.4986582
[28] W. Guamán, P. Benalcazar, K. Ñacato et al. Journal of Economy and Technology 2 (2024) 31–46
[29] Agency for the Cooperation of Energy Regulators, “UIC Report-Electricity Infrastructure,” 2015. [Online]. Available: 〈http://www.acer.europa.eu/Official_documents/Publications/UIC_Electricity〉.
[30] ETESA, “Plan de Expansión del Sistema Interconectado Nacional de Panama 2022-2036 [Panama’s National Interconnected System Expansion Plan 2022-2036],” 2023.
[31] Brinckerhoff Parsons and Cable Consulting International Ltd., “Electricity Transmission Costing Study,” 2012.
[32] ENDE Corporacion, “Audiencia rendición de cuentas Sistema Nacional de Transmision de Electrididad de Bolivia [Accountability Hearing National Electricity Transmission System of Bolivia],” 2018.
[33] CELEC EP Transelectric, “Servicios de consultoría para la fiscalización de los diseños, suministro y construcción de sistemas de transmisión de extra alta tensión a 500 kV y obras asociadas a 230 kV [Consulting services for the supervision of the design, supply and construction o,” 2014.
[34] Unidad de Planeacion Minero Energetica, “Selección de un inversionista y un interventor para el diseño, adquisición de los suministros, construcción, operación y mantenimiento de la segunda línea de transmisión Bolivar-Cartagena 220 kV [Selection of an investor and an auditor for the design, pro,” Bogota, 2013. [Online]. Available: 〈http://www.nber.org/papers/w16019〉.
[35] Ministerio de Economia y Finanzas del Peru, “Contrato de Consecion ‘Linea de Transmision SGT 500 kV Chilca-Marcona-Montalvo’ [Consulting Contract "Transmission Line SGT 500 kV Chilca-Marcona-Montalvo],” 2010.